dc.contributor.advisorPinzón Ardila, Omar
dc.contributor.authorPeña Duarte, María Alejandra
dc.coverage.temporal2020
dc.date.accessioned2021-09-14T17:19:46Z
dc.date.available2021-09-14T17:19:46Z
dc.date.issued2020
dc.identifier.urihttp://hdl.handle.net/20.500.11912/9163
dc.description129 páginasspa
dc.description.abstractEn la empresa Copower LTDA, se desarrolló el proyecto de sistema solar fotovoltaico de 10 kW en el hotel Mansión Campestre San Alberto-Cesar. Aquí se buscó satisfacer la necesidad del cliente instalando la cantidad de kW que este quería. Primero realizando visitas al sitio para tomar datos que nos sirvieran a la hora de hacer la debida programación en el BlueSol y poder obtener y mostrarle al cliente unos resultados aproximados de la generación de energía que podría tener al instalar los paneles solares. Segundo se reunió con el cliente para mostrarle la propuesta final y que él tomara la decisión de empezar a instalar el sistema, al dar la debida aprobación se instalaron los equipos solares que se necesitaban para el proyecto, en conjunto se gestionaban los permisos para que al finalizar la conexión en el hotel se pudiera realizar la inscripción de éste ante el operador de red, (ESSA); permitiendo obtener la certificación RETIE y que el proyecto quedara validado ante la ley y de esta forma evitar problemas en un futuro. Finalmente se realiza el monitoreo de la generación que obtenían los paneles solares mediante las pantallas NEP de los microinversores.spa
dc.description.abstractIn the company Copower LTDA, the 10 kW photovoltaic solar system project was developed at Mansión Campestre San Alberto-Cesar hotel. Here we sought to satisfy the customer\'s needs by installing the amount of kW that he wanted. First by making visits to the site to take data that would help us to do the proper programming in the BlueSol and to be able to obtain and show the client approximate results of the energy generation that could be obtained when installing the solar panels. Second, he met with the client to show him the final proposal and for him to make the decision to start installing the system. Upon giving due approval, the solar equipment needed for the project was installed; together, permits were managed so that the at the end of the connection at the hotel, it could be registered with the network operator (ESSA); allowing to obtain the RETIE certification and the project to be validated before the law and that way avoid future issues. Finally, the monitoring of the generation obtained by the solar panels is carried out through the NEP screens of the microinverters.eng
dc.format.mimetypeapplication/pdf
dc.language.isospa
dc.publisherUniversidad Pontificia Bolivarianaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectGeneradores de energía fotovoltaicaspa
dc.subjectEmpresas - Copower Ltdaspa
dc.subjectHoteles - Mansión campestrespa
dc.subjectSan Alberto (Cesar, Colombia)spa
dc.subjectCertificación - RETIEspa
dc.titleSupervisión del diseño, montaje y puesta en marcha de un sistema de generación eléctrico fotovoltaico de capacidad de 10 kWspa
dc.typePrácticaspa
dc.publisher.departmentEscuela de Ingenieríasspa
dc.publisher.programIngeniería Electrónicaspa
dc.type.hasVersionpublishedVersionspa
dc.description.sectionalBucaramangaspa
dc.description.degreenameIngeniero Electrónicospa


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 International
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 International