Mostrar el registro sencillo del ítem
Análisis económico de las actividades involucradas en el procedimiento de cimentación para la construcción del proyecto torres de verona.
dc.contributor.advisor | Tijo López, Silvia Juliana | |
dc.contributor.author | Ramírez Meza, Katherine Duperly | |
dc.contributor.author | Florez Ardila, Nancy Liliana | |
dc.coverage.spatial | Seccional Bucaramanga. Universidad Pontificia Bolivariana. Escuela de Ingenierías. Facultad de Ingeniería Civil. | spa |
dc.coverage.temporal | Marzo 2012 | |
dc.date.accessioned | 2017-11-29T21:05:19Z | |
dc.date.available | 2017-11-29T21:05:19Z | |
dc.date.issued | 2012-03 | |
dc.identifier.uri | http://hdl.handle.net/20.500.11912/3509 | |
dc.description | 107p.: (pdf), il; tablas. | spa |
dc.description.abstract | La siguiente investigación se desarrolló en el proyecto Torres de Verona, localizado en la zona Metropolitana de Bucaramanga, donde se llevó a cabo un seguimiento constructivo de algunas actividades ejecutadas en la cimentación, durante un periodo de 4 meses. A partir de la obtención de datos en campo y el presupuesto previamente estimado por la constructora GESTORA Y PROMOTORA URBANA S.A, se establece una unidad de medida comparativa, definiendo los factores de afectación de los resultados obtenidos; determinando así ciertos criterios de referencia que permitirán una mayor eficiencia y por ende lograr beneficios a futuro en este tipo de obras. Los resultados obtenidos en este trabajo dan diferencias muy notables con respecto al trabajo de campo versus presupuestado y la influencia de clima que incidió en los rendimientos para la evaluación de este proyecto. Tanto la empresa como el contratista se ven afectados económicamente. | spa |
dc.description.abstract | The following research was conducted in Verona Torres project, located in the metropolitan area of Bucaramanga, where we held a constructive follow OF some foundation activities implemented over a period of 4 months. From the field data collection and the budget previously estimated by the construction company GESTORA Y PROMOTORA URBAN SA, provides a comparative measure unit, defining the factors affected the results obtained, thus determining certain benchmarks that will allow efficiency and thus achieve future benefits in this type of work. The results obtained in this study are notable differences with respect to the budgeted versus field work and the influence of weather had an impact on yields for the evaluation of this project. Both the company and the contractor are affected financially. | |
dc.language.iso | es | |
dc.publisher | Universidad Pontificia Bolivariana | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Análisis económico | spa |
dc.subject | Proyectos de construcción - Torres de verona | spa |
dc.subject | Construcción - Presupuestos | spa |
dc.subject | Costos de mano de obra | spa |
dc.subject | Empresas - Gestora y promotora Urbanas S.A. | spa |
dc.subject | Eficiencia industrial | spa |
dc.subject | Torres - Cimientos | spa |
dc.title | Análisis económico de las actividades involucradas en el procedimiento de cimentación para la construcción del proyecto torres de verona. | spa |
dc.type | bacherlorThesis | spa |
dc.rights.accessRights | openAccess | spa |
dc.type.hasVersion | publishedVersion | spa |
dc.identifier.instname | instname:Universidad Pontificia Bolivariana | spa |
dc.identifier.reponame | reponame:Repositorio Institucional de la Universidad Pontificia Bolivariana | spa |
dc.identifier.repourl | repourl:https://repository.unab.edu.co/ |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Trabajos de grado [6348]
Monografías, artículos, informes, proyecto de grado