dc.contributor.advisor | Hernández Capacho, Carlos Gerardo | |
dc.contributor.author | Rangel Castillo, Hernando | |
dc.coverage.spatial | Seccional Bucaramanga. Universidad Pontificia Bolivariana. Escuela de Ingenierías. Facultad de Ingeniería Electrónica | spa |
dc.coverage.temporal | 2010 | |
dc.date.accessioned | 2013-08-28T16:59:54Z | |
dc.date.available | 2013-08-28T16:59:54Z | |
dc.date.created | 2010-02-17 | |
dc.date.issued | 2013-08-28 | |
dc.identifier.uri | http://hdl.handle.net/20.500.11912/1028 | |
dc.description | 76p.: (pdf); il; tablas; anexos | spa |
dc.description.abstract | El desarrollo de este trabajo, constituye las experiencias aportadas por la practica empresarial realizada en Cristalería Peldar S.A. que fue fundada en Medellín, Colombia en 1949; bajo órdenes del ingeniero Jorge Mario Zuluaga; durante el periodo de tiempo comprendido entre de 24 junio y 23 de diciembre del 2009. El plan propuesto durante la práctica contenía una inducción de seguridad; conocimientos de la planta, procesos y funciones de diferentes maquinas; optimización del sistema de refrigerado de agua de tijeras; reparación del asistente de operador, capacitación de seguridad para prevención de accidentes dentro de la empresa; y para llevar un monitoreo de los consumos de energía, gas y agua de la empresa y asistencia al instrumentista a cargo para realizar diferentes labores de mantenimiento y reparación de equipos. Dichos proyectos se llevaron a cabo en su totalidad a través de una charla de normas de seguridad y uso de dotación y materiales de la misma planta; recorrido informativo por la fábrica; un proyecto que se realizo por medio de dos etapas: la primera se conecto la bomba de aceite a la salida del PLC que controlaba la entrada de agua, y así entrara aceite durante el mismo tiempo que entrara agua al tanque y se montó el sensor de Bajo nivel en el sistema, el cambio de la programación del PLC Allen Bradley, además de la programación pertinente para este cambio; talleres con los bomberos de la empresa; calibración de combustión en afinación B y de los sensores de temperaturas en el Bosting y trabajo en conjunto con el instrumentista con el cual se reparo un pirometro, se reparo la bascula de pesos menores en el área de materia prima, entre otros; en el orden respectivo. Aparte de esto se llevo indujo la programación de plc logo simens, se efectuó el mantenimiento y reparación de elctrovalvulas y se dejo un manual de reparación de tarjetas de asistente de operador y de reparación de cajas Com Soc 1. | spa |
dc.description.abstract | The development of this work is the experience provided by the business practices conducted in glassware Peldar SA was founded in Medellin, Colombia in 1949 on orders from the engineer Jorge Mario Zuluaga; during the period between 24 June and 23 December 2009. The proposed plan for the practice included a safety induction, knowledge of the plant, processes and functions of different machines, optimizing the water cooling system of scissors, repair wizard operator safety training for accident prevention within the company, and to keep track of energy consumption, gas and water company and assistance by the instrumentalist to perform various tasks of maintenance and repair of equipment. These projects were carried out entirely through a discussion of safety standards and use of staffing and materials of the same plant, informative tour of the factory, a project that was carried through two stages: the first is connected oil pump at the outlet of the PLC controlling the entry of water, and oil well came during the same time as water enters the tank and climbed the low level sensors in the system, changing the programming of Allen Bradley PLC, programming also pertinent to this change, workshops with the company's firefighters calibration, combustion tuning B and temperature sensors in Bosting and working together with the instrument with which to repair a pyrometer, was repaired moves from lower weights in the area of raw materials, among others, concerned in order in each plan. In addition it was made an induction logo simens plc programming was carried out maintenance and repair elctrovalvulas and left a repair manual card operator and assistant boxes repair Com Soc 1. | |
dc.language.iso | es | |
dc.publisher | Universidad Pontificia Bolivariana | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Tesis y disertaciones académicas | spa |
dc.subject | Ingeniería electrónica | spa |
dc.subject | Cristales Peldar S.A - Medellín | spa |
dc.subject | PLC - programas para computador | spa |
dc.subject | Sensores [electrónica] | spa |
dc.title | Informe de práctica profesional O-I Peldar planta Envigado | spa |
dc.type | workingPaper | spa |
dc.rights.accessRights | openAccess | spa |
dc.type.hasVersion | publishedVersion | spa |
dc.identifier.instname | instname:Universidad Pontificia Bolivariana | spa |
dc.identifier.reponame | reponame:Repositorio Institucional de la Universidad Pontificia Bolivariana | spa |
dc.identifier.repourl | repourl:https://repository.unab.edu.co/ | |