Participación en el sistema de gestión de calidad del proyecto Monte Olivetto en Urbanas S.A

dc.contributor.advisorOspina Idarraga, Gustavo Andres
dc.contributor.authorMancilla Flantermesky, Juan Sebastian
dc.date.accessioned2026-02-19T17:36:22Z
dc.date.available2026-02-19T17:36:22Z
dc.date.issued2015spa
dc.description57spa
dc.description.abstractEn el siguiente documento se muestra el trabajo desarrollado por el practicante durante los 4 meses de su práctica realizada en la empresa URBANAS S.A., en la ejecución del proyecto inmobiliario de Monte Olivetto desempeñándose como auxiliar de calidad en obra. El trabajo de grado comienza reportando la construcción de un sistema de contención de pantallas ancladas para dar inicio a la fase de cimentación y estructura de sótanos. A las actividades desarrolladas en la obra se implementó una serie de controles estipulados en el plan de calidad elaborado para el proyecto y cumpliendo con los requisitos del sistema de gestión de calidad. La planeación de actividades, actualización de los planos de la obra, comisión topográfica y recepción de productos como el concreto y acero son algunas de las actividades que cuentan con un formato de control y seguimiento creado por la empresa con el fin de garantizar su ejecución y calidad. Los formatos deben estar actualizados y en su mayoría diligenciados por el practicante, con base a la información consignada en los formatos se pueden detectar los productos no conformes principalmente en los concretos y los aceros recibidos en la obra. Al final de cada mes se redacta un informe donde se incluye el indicador de calidad y los productos no conformes que se presentaron en ese periodo de tiempo, con el fin de reflejar el avance del indicador de calidad y plantear soluciones a los productos no conformes para realizar el cierre y la liberación de los mismos.spa
dc.description.abstractThe following document shows the work done during the internship at URBANAS S.A., spanning four months dedicated to the Monte Olivetto project. The author worked as construction assistant for quality control. The work of grade starts reporting the construction of a retaining structure for the foundation system. The activities developed in the Project were related to the application of quality controls as specified in the master plan of the project. Planning of activities, drawings updating, topographical commissions and reception of products at the project site such as concrete and steel were some of the activities followed using the controlling and monitoring formats implemented by the company in order to ensure product quality. The forms had to be updated and filled mostly by the intern, where inconsistencies and non-conformities are detected, mostly due to concrete and steel received at the site. At the end of each month a report had to be done indicating the quality indices and the non-conforming products, showing the solutions to the non-conformities as well.en
dc.description.degreenameIngeniero Civilspa
dc.description.sectionalBucaramangaspa
dc.format.mimetypeapplication/pdfspa
dc.identifier.urihttp://hdl.handle.net/20.500.11912/13432
dc.language.isospaspa
dc.publisher.departmentEscuela de Ingenieríaspa
dc.publisher.programIngeniería Civilspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectPlaneaciónspa
dc.subjectCalidadspa
dc.subjectControlspa
dc.subjectProducto No Conformespa
dc.subjectConcretospa
dc.subjectAcerospa
dc.titleParticipación en el sistema de gestión de calidad del proyecto Monte Olivetto en Urbanas S.Aspa
dc.typePrácticaspa
dc.type.hasVersionpublishedVersionspa

Archivos

Bloque original

Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
C5.pdf
Tamaño:
2.13 MB
Formato:
Adobe Portable Document Format
Descripción: