Supervisión para la reconstrucción de vivienda en municipios de Santander afectados por sismo del 10 de marzo de 2015
| dc.contributor.advisor | Serrano Suárez, David Joseph Auresy | |
| dc.contributor.author | Jaramillo Díaz, Luz Ángela | |
| dc.coverage.spatial | Bucaramanga | spa |
| dc.coverage.temporal | 2016 | spa |
| dc.date.accessioned | 2026-03-03T17:43:05Z | |
| dc.date.available | 2026-03-03T17:43:05Z | |
| dc.date.issued | 2016 | spa |
| dc.description | 89 Páginas | spa |
| dc.description.abstract | Práctica empresarial realizada por medio de una unión temporal, enfocada en la supervisión como interventoría de la reconstrucción de las viviendas que se afectaron en los diferentes municipios debido al sismo ocurrido el 10 de marzo de 2015. En este informe se describen detalladamente las actividades realizadas para llevar a cabo un trabajo exitoso, los conocimientos adquiridos durante dicho periodo de gran importancia para la formación profesional de un ingeniero civil, los métodos de construcción y materiales utilizados, especificaciones particulares de las viviendas; además de los procesos administrativos en los que se desarrolla la labor de supervisión. Igualmente se exponen las bases con el que se rige el contrato y el compromiso que adquiere la interventoría para velar por la calidad y seguridad en la reconstrucción de dichas viviendas. Por último, se realizan las observaciones, conclusiones y recomendaciones a partir del aprendizaje adquirido y ejecutado lo largo de la práctica empresarial. | spa |
| dc.description.abstract | nternship done by a Joint Venture focused on supervision, as auditors, in the rebuilding process of the houses affected by an earthquake occurred on 10th March 2015, in different municipalities. This report describes in detail all activities performed to achieve a successful job, knowledge acquired during this period, a very important time for training a civil engineer, building methods and materials used, particular specifications for houses in the process, as well as administrative procedures required for auditor’s labor. In addition, the paper includes the bases that rule the contract and the commitment acquired by the auditors in order to ensure the quality and safety in the houses rebuilding process. Finally, some observations, conclusions, and recommendations are placed, based on the knowledge acquired and performed during the internship. | en |
| dc.description.degreename | Ingeniero Civil | spa |
| dc.description.sectional | Bucaramanga | spa |
| dc.format.mimetype | application/pdf | spa |
| dc.identifier.uri | http://hdl.handle.net/20.500.11912/13579 | |
| dc.language.iso | spa | spa |
| dc.publisher.department | Escuela de Ingeniería | spa |
| dc.publisher.program | Ingeniería Civil | spa |
| dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
| dc.subject | Interventoría | spa |
| dc.subject | sismo | spa |
| dc.subject | reconstrucción | spa |
| dc.subject | catástrofe | spa |
| dc.subject | supervisión | spa |
| dc.title | Supervisión para la reconstrucción de vivienda en municipios de Santander afectados por sismo del 10 de marzo de 2015 | spa |
| dc.type | Práctica | spa |
| dc.type.hasVersion | publishedVersion | spa |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- 31.pdf
- Tamaño:
- 4.45 MB
- Formato:
- Adobe Portable Document Format
- Descripción: