dc.description.abstract | Este informe presenta el trabajo realizado durante 4 (cuatro) meses de práctica empresarial teniendo como objetivo principal el control y supervisión de dos proyectos, la cual me desempeñe como auxiliar de supervisión en la ejecución del proceso constructivo de la pavimentación de la vía Toledo – Mirador - Buena Vista, sector PR
0+00 – PR 0 + 550 y las calles de los barrios Belén y La Pradera del municipio de Toledo, Norte de Santander.
En este proceso se muestra toda la ejecución de la obra de pavimentación desde la localización, replanteo, extendido del material, compactación, construcción de losas de concreto y bordillos; se desarrolló ensayos de campo como viguetas, cilindros y densidades de campo para llevar un control de los materiales que está utilizando. Se concluye que es importante cumplir con los diseños y especificaciones técnicas de invias para garantizar una larga vida útil del pavimento; también es importante la experiencia de los ingenieros de la obra, ya
que detectan las causas del problema y dan una rápida solución. | spa |
dc.description.abstract | This report presents the work carried out during 4 (four) months of business practice, with the main objective of controlling and supervising two projects, which I served as an auxiliary supervisor in the execution of the
construction process of the paving of the Toledo - Mirador road - Buena Vista, sector PR 0 + 00 - PR 0 + 550 and the streets of the Belén and La Pradera neighborhoods of the municipality of Toledo, Norte de Santander. This process shows all the execution of the paving work from the location, stakeout, spread of the material, compaction, construction of concrete slabs and curbs; Field trials such as joists, cylinders and field densities were developed to keep track of the materials you are using.It is concluded that it is important to comply with the designs and technical specifications of Invias to ensure a long service life of the pavement; It is also important the experience of the engineers of the work, since they detect the causes of the problem and give a quick solution. | eng |
dc.format.mimetype | application/pdf | |
dc.language.iso | spa | |
dc.publisher | Universidad Pontificia Bolivariana | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Toledo (Norte de Santander, Colombia) | spa |
dc.subject | Pavimentos | spa |
dc.subject | Supervisión de obras civiles | spa |
dc.subject | Barrios - Belén | spa |
dc.subject | Barrios - Pradera | spa |
dc.subject | Hormigón | spa |
dc.subject | Materiales de construcción | spa |
dc.title | Apoyo al seguimiento y control de la ejecución del proceso constructivo de la pavimentación de la vía Toledo – Mirador -Buenavista, sector PR 0+00 –PR 0 + 550 y las calles de los barrios belén y la pradera del municipio de Toledo, norte de Santander | spa |
dc.type | Práctica | spa |
dc.publisher.department | Escuela de Ingenierías | spa |
dc.publisher.program | Ingeniería Civil | spa |
dc.type.hasVersion | publishedVersion | spa |
dc.description.sectional | Bucaramanga | spa |
dc.description.degreename | Ingeniero Civil | spa |