Show simple item record

Actualización tecnológica de la planta generadora de nitrógeno de la refinería de Barrancabermeja

dc.contributor.advisorMantilla Saavedra, Juan Carlos
dc.contributor.authorVélez Ágamez, Clara Ines
dc.contributor.authorDuarte Antolínez, Jorge
dc.coverage.spatialSeccional Bucaramanga. Universidad Pontificia Bolivariana. Escuela de Ingenierías. Facultad de Especialización en Control e Instrumentación Industriales_CO
dc.coverage.temporal2010es_CO
dc.date.accessioned2013-08-28T16:59:39Z
dc.date.available2013-08-28T16:59:39Z
dc.date.created2010-08-09es_CO
dc.date.issued2013-08-28
dc.identifier.urihttp://hdl.handle.net/20.500.11912/879
dc.description74p.: (pdf); il; tablas, anexoses_CO
dc.description.abstractLa planta de nitrógeno se encuentra fuera de servicio aproximadamente hace 10 años, debido a un evento de falla en una turbina turboexpansora que no fue atendido oportunamente, recurriendo a comprar a empresas externas el nitrógeno. Con el paso del tiempo se deterioro la instrumentación asociada a la planta y se hizo inviable la recuperación tecnológica. En la actualidad el costo por compra de nitrógeno ha superado los márgenes calculados, por lo cual se ha considerado nuevamente la recuperación y puesta en servicio de la planta. La presente propuesta desarrollará un documento con los entregables de la ingeniería básica a la implementación de una actualización tecnológica de la planta generadora de nitrógeno de la U-4100 de la refinería de Ecopetrol. Dentro de dicha ingeniería se encuentra la descripción y caracterización del proceso, el estado de la instrumentación actual, el diseño y selección de la instrumentación, sistemas de control y sistema SCADA de la planta, presentando la evaluación de viabilidad técnica y económica del proyecto.es_CO
dc.description.abstractThe nitrogen plant has been outside of service approximately for the last 10 years, due to a flaw event in a turboexpansor turbine that was not assisted appropriately, appealing to buy the nitrogen to external companies. With the pass of the time, the instrumentation associated to the plant was deteriorated and the technological recovery is not possible. Nowadays, the cost for nitrogen purchase has overcome the calculated margins; for this reason it has been considred the recovery and setting again in service of the plant. The present proposal will develop a document with the deliverable basic engineering for the implementation of a technological upgrade of the nitrogen generating plant in the U-4100 of the refinery of Ecopetrol. Inside this document you will find is the description and characterization of the process, the state of the current instrumentation, the design and selection of the instrumentation, control system and SCADA system of the plant, presenting the evaluation of technical and economic viability for the project.es_CO
dc.language.isoeses_CO
dc.publisherUniversidad Pontificia Bolivarianaes_CO
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.sourceinstname:Universidad Pontificia Bolivarianaes_CO
dc.sourcereponame:Repositorio Institucional de la Universidad Pontificia Bolivarianaes_CO
dc.subjectTesis y disertaciones académicases_CO
dc.subjectTurbina turboexpansoraes_CO
dc.subjectPlanta generadora de nitrógenoes_CO
dc.titleActualización tecnológica de la planta generadora de nitrógeno de la refinería de Barrancabermejaes_CO
dc.typebookes_CO
dc.rights.accessRightsopenAccesses_CO
dc.type.hasVersionpublishedVersiones_CO


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 International
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 International