Apoyo técnico a la interventoría de pruebas industriales aplicadas en la construcción de Gasoducto
dc.contributor.advisor | Fontecha Dulcey, Gilberto Carlos | |
dc.contributor.author | Moreno Alvarez, Holguer Yesid | |
dc.coverage.spatial | Seccional Bucaramanga. Universidad Pontificia Bolivariana. Escuela de Ingenierías. Facultad de Ingeniería Mecánica | spa |
dc.coverage.temporal | 2009 | |
dc.date.accessioned | 2013-07-16T21:54:02Z | |
dc.date.available | 2013-07-16T21:54:02Z | |
dc.date.created | 2010-02-24 | |
dc.date.issued | 2013-07-16 | |
dc.identifier.uri | http://hdl.handle.net/20.500.11912/658 | |
dc.description | 91p.: (pdf); il; tablas; anexos | spa |
dc.description.abstract | Las actividades realizadas por el estudiante en práctica durante los seis meses en Metrogas de Colombia S.A. ESP., se ejecutaron durante la interventoría de la construcción de gasoducto en tubería de acero al carbón de 4” y 6” basado en las normas nacionales e internacionales debido a la necesidad de ampliar y mejorar la cobertura de la empresa. Se supervisó y aprobó las labores de transporte y tendido de tubería, doblado y soldadura de tubería, control radiográfico, protección contra la corrosión, bajado de tubería, prueba hidrostática y secado, cruces especiales, empalme red existente, reposición de zonas afectadas y llenado de línea con gas natural, entre otras actividades propias de la interventor como avances de pagos de contrato y el trámite de permisos ante los diferentes entidades públicas. Se obtiene exitosamente la construcción del gasoducto y se permite mejorar y ampliar el suministro de gas natural a diferentes poblaciones. Adicionalmente a la interventoría se empleó la metodología de inspección basada en el riesgo (RBI), para el análisis de la criticidad y nivel de riesgo de la estación receptora (City Gate) donde se determinaron los mecanismos de daño de los diferentes elementos sometidos a presión y así mismo la velocidad de corrosión y desgaste y por tanto el nivel de riesgo de la estación, analizando las consecuencias y la probabilidad de falla de los equipos. Para integrar y controlar el mantenimiento de los equipos de la estación City Gate se desarrolla una base de datos en Microsoft Office Access 2007 donde se mantiene todos los datos necesarios de los equipos, incluyendo las fechas de mantenimiento, calibración y la descripción del mantenimiento realizado; A esta base de datos se incorpora el diagrama visual de la estación receptora realizada en Excel y el análisis de criticidad de la estación. | spa |
dc.description.abstract | The activities realized by the student in the internship during the six months in METROGAS DE COLOMBIA S.A. ESP., were executed during commissioning of the construction of gas pipeline in the 4” and 6” coaled steel pipe based on the national and international standards due to the necessity to extend and to improve the cover of the company. Pipe transporting were supervised and approved as well as laying dubbing and welding, x-ray control, protection against the corrosion, lowering, hydrostatic testing and special drying, crossings, joining to existing networks, replacement of affected zones and filling of line with natural gas, among other activities associated, such as advances of contract payments and the proceedings of permissions before the different public organizations. The construction of the gas pipeline is successfully obtained and it allowed the improvement and to extend the natural gas provision to different populations. In addition it was used the methodology of inspection based on the risk (RBI), for the analysis of the criticality and risk level of the receiving station (City Gate) where they also determined the mechanisms of damage of the different elements under pressure and the rate of corrosion, then finding the risk level of the station, analyzing the consequences and the probability of fault of the equipment. In order to integrate and to control the maintenance of the equipment of the City Gate station, it is developed a data base in Microsoft Office Access 2007 where necessary data of the equipment are kept, including the dates of maintenance, calibration and the description of the realized maintenance; To this data base, visual diagram of the receiving station, done in Excel was added and the analysis of criticality of the station. | spa |
dc.language.iso | es | |
dc.publisher | Universidad Pontificia Bolivariana | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Ingeniería mecánica | spa |
dc.subject | Tesis y disertaciones académicas | spa |
dc.subject | Gasoducto | spa |
dc.subject | Prueba hidrostática | spa |
dc.subject | Gasoducto - construcción | spa |
dc.title | Apoyo técnico a la interventoría de pruebas industriales aplicadas en la construcción de Gasoducto | spa |
dc.type | bacherlorThesis | spa |
dc.rights.accessRights | openAccess | spa |
dc.type.hasVersion | publishedVersion | spa |
dc.identifier.instname | instname:Universidad Pontificia Bolivariana | spa |
dc.identifier.reponame | reponame:Repositorio Institucional de la Universidad Pontificia Bolivariana | spa |
dc.identifier.repourl | repourl:https://repository.unab.edu.co/ |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Trabajos de grado [6349]
Monografías, artículos, informes, proyecto de grado