Mostrar el registro sencillo del ítem

dc.contributor.advisorDirector. Villa Marulanda, Marcela
dc.contributor.authorGonzález Gualdrón, Natalia Alexandra
dc.contributor.authorMoreno Acosta, José Gabriel
dc.coverage.temporal2013
dc.date.accessioned2020-09-21T14:27:47Z
dc.date.available2020-09-21T14:27:47Z
dc.date.issued2013
dc.identifier.urihttp://hdl.handle.net/20.500.11912/6050
dc.description93p.: (pdf); il; tablas; anexos.spa
dc.description.abstractEl presente trabajo de grado tuvo como propósito principal el desarrollo de un estudio de métodos y tiempos en la planta de la empresa Comercial Industrial Nacional S.A. agencia Girón donde por medio de la observación directa se tomaron los tiempos de las diferentes actividades que componen los procesos de la planta en las líneas de ensamble y mantenimiento de cilindros. El desarrollo de la metodología inicio con el diagnostico general de la empresa por medio de la observación directa y teniendo como apoyo entrevistas al personal operativo y administrativo de la planta, manual de funciones ya que los procesos están estandarizados, manual de calidad y normatividad vigente como la NTC 522-1, posteriormente se paso a corroborar minuciosamente las actividades de las operaciones y los tiempos y métodos que se estaban empleando. Para poder recolectar la información para realizar el estudio de métodos y tiempos fue necesario realizar previamente una premuestra ya que la empresa no contaba con datos históricos, se utilizó la distribución t-student para muestras menores a 30 y así poder calcular la muestra que se utilizo en la recolección por medio de un registro de toma de tiempos diligenciado en la labor de campo que se realizo en los meses de Agosto y Octubre de 2012. Seguidamente se tabulo y registro la información teniendo en cuenta los suplementos y calificaciones que se tomaron durante la toma de tiempos para poder hallar el estándar de cada operación, además se utilizó el diagrama hombre-máquina para determinar el tiempo muerto del operario y de la máquina y así poder tener un óptimo equilibrio del ciclo de trabajo. Otra herramienta utilizada fue el balance de línea, se utilizó el tiempo estándar obtenido para hallar el número de operarios que requiere cada proceso y la eficiencia de la línea para así establecer conclusiones y plantear recomendaciones.spa
dc.description.abstractThis paper degree had as main purpose the development of a study of methods and times on the plant of the National Industrial Comercial S.A. Giron agency where through direct observation times were taken of the different activities that make up the plant processes in assembly lines and maintenance of cylinders. The development of the methodology beginning with the company's general diagnosis through direct observation and interviews given to support operational and administrative staff of the plant, manual functions and processes are standardized, quality manual and applicable regulations as the NTC 522-1, subsequently thoroughly corroborate step operations activities and the times and methods that were being used. In order to collect information for the study of methods and time was needed previously one presample as the company did not have historical data, we used the t-student distribution for samples less than 30 and so to calculate the sample that was used in the collection by making a record filled times in field work that was conducted in the months of August and October 2012 then tabulated and recorded the information given supplements and ratings taken during the making of times in order to find the standard of each operation, also the diagram was used to determine human machine operator downtime and machine so we can have an optimal balance of the work cycle. Another tool used was the line balancing, standard time was used obtained to find the number of workers required for each process and the efficiency of the line and draw conclusions and make recommendations.eng
dc.format.mimetypeapplication/pdf
dc.language.isospa
dc.publisherUniversidad Pontificia Bolivarianaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectEmpresas - CINSAspa
dc.subjectAdministración del tiempospa
dc.subjectDiagnósticospa
dc.subjectManual de funcionesspa
dc.subjectNormas técnicas - NTC 522-1spa
dc.subjectCilindrosspa
dc.titleEstudio de métodos y tiempos en la empresa CINSA - Girónspa
dc.typeTrabajo de gradospa
dc.publisher.departmentEscuela de Ingenieríasspa
dc.publisher.programIngeniería Industrialspa
dc.type.hasVersionpublishedVersionspa
dc.description.sectionalBucaramangaspa
dc.description.degreenameIngeniero Industrialspa


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 International
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 International