Mostrar el registro sencillo del ítem
Factores que impactan la producción de la mano de obra en actividades de construcción: Movimientos de tierra, urbanismos y obras complementarias
dc.contributor.advisor | Viecco Márquez, Margareth Indira | |
dc.contributor.author | Mancilla Valderrama, Fredy Alonso | |
dc.contributor.author | Sarmiento Duarte, Hector Daniel | |
dc.coverage.temporal | 2013 | |
dc.date.accessioned | 2020-09-10T15:24:44Z | |
dc.date.available | 2020-09-10T15:24:44Z | |
dc.date.issued | 2013 | |
dc.identifier.uri | http://hdl.handle.net/20.500.11912/5987 | |
dc.description | 140 páginas | spa |
dc.description.abstract | Se elaboró una base datos de rendimiento y/o productividad donde se estudió ciertos factores que inciden positiva o negativamente en cada una de las actividades de un proyecto de construcción, como lo son la supervisión, el esquema contractual, el clima, la hora en que se realizó la labor en la obra; durante las etapas de movimientos de tierra y urbanismo en proyectos realizados en Bucaramanga y su Área Metropolitana. La información que se recopiló en campo se le realizó un análisis estadístico ajustado a una distribución normal con el propósito de encontrar la correlación que hay entre los factores de afectación (variable independiente) y el rendimiento (variable dependiente), aplicando una regresión lineal que generó unas ecuaciones que pronostican la manera en que actúa cada actividad, para así modelar situaciones reales de las actividades en obra mediante el uso de una hoja de cálculo en EXCEL que determine los costos reales de la mano de obra. | spa |
dc.description.abstract | Was developed a database of productivity and / or performance where we studied certain factors that positively or negatively affect the activities of a construction project, such as the supervision, contractual scheme, the weather, the time the labor was realized in the work; for the stages of earthworks and urbanism projects undertaken in Bucaramanga and its Metropolitan Area. The information that was collected in the field was performed a statistical analysis adjusted to a normal distribution with the aim to find the correlation between the involvement factors (independent variable) and (dependent variable), using a linear regression that generated some equations that predict how each activity works, for modeling real situations in work activities by using a spreadsheet in Excel to determine the real costs of the labor. | eng |
dc.format.mimetype | application/pdf | |
dc.language.iso | spa | |
dc.publisher | Universidad Pontificia Bolivariana | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Construcción | spa |
dc.subject | Bases de datos | spa |
dc.subject | Proyectos de construcción | spa |
dc.subject | Rendimiento | spa |
dc.subject | Productividad en el trabajo | spa |
dc.title | Factores que impactan la producción de la mano de obra en actividades de construcción: Movimientos de tierra, urbanismos y obras complementarias | spa |
dc.type | Trabajo de grado | spa |
dc.publisher.department | Escuela de Ingenierías | spa |
dc.publisher.program | Ingeniería Civil | spa |
dc.type.hasVersion | publishedVersion | spa |
dc.description.sectional | Bucaramanga | spa |
dc.description.degreename | Ingeniero Civil | spa |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Trabajos de grado [6349]
Monografías, artículos, informes, proyecto de grado