dc.contributor.advisorBautista García, Gerardo
dc.contributor.authorAmaya Urquijo, Nathalia Andrea
dc.coverage.spatialBucaramangaspa
dc.coverage.temporal2021spa
dc.date.accessioned2025-04-25T19:06:21Z
dc.date.available2025-04-25T19:06:21Z
dc.date.issued2021
dc.identifier.urihttp://hdl.handle.net/20.500.11912/12411
dc.description53 páginasspa
dc.description.abstractEl presente documento de trabajo de grado bajo la modalidad de práctica empresarial, se encuentra basado en la asistencia técnica que la practicante realizó en el proyecto Millennium Business Tower, ubicado en la ciudad de Bucaramanga, durante un periodo de cuatro (4) meses en la “Constructora Innova S.A.S.”. Las actividades realizadas por la practicante consistieron en el seguimiento y control del avance en el proceso de acabados, específicamente en el área de pintura, con el fin de dar cumplimiento a los objetivos y funciones requeridas. Ésta supervisó la realización de actividades del personal de obra, por medio de la creación de un cronograma y formatos de avance de obra, logrando evidenciar una correcta ejecución de los trabajos asignados y verificando la adecuada aplicación de las técnicas a trabajar, además, realizó cortes de obra del personal. Así mismo, se encargó de diligenciar los pedidos de material de pintura, calculando las cantidades a utilizar en el corte mencionado, llevando el control de inventario de éstos, y haciendo entrega exclusivamente de lo necesario al personal, con el objetivo de evitar sobrecostos en éste ámbito.en
dc.description.abstractThis degree work document under the modality of business internship, is based on the technical assistance that the intern carried out in the Millennium Business Tower project, located in the city of Bucaramanga, during a period of four (4) months at “Constructora Innova S.A.S.”. The activities carried out by the intern consisted of monitoring and controlling the progress in the finishing process, specifically the painting area, in order to comply with the objectives and required functions. Said intern supervised the performance of activities of the work personnel, by creating a schedule and work progress formats, achieving evidence of a correct execution of the assigned work and verifying the adequate application of the techniques to work, in addition, she also made cuts of work of the personnel. Furthermore, she was in charge of filling the orders for painting material, calculating the quantities to be used in the aforementioned cut, keeping an inventory control of these, and delivering exclusively what was necessary to the staff, in order to avoid overrun costs in this area.en
dc.format.mimetypeapplication/pdfspa
dc.language.isospaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectIngeniería Civilspa
dc.subjectSupervisiónspa
dc.subjectPinturaspa
dc.subjectAcabadosspa
dc.subjectCronogramaspa
dc.subjectSeguimientospa
dc.titleAsistencia técnica de obra en la ejecución del proyecto Millennium Business Tower localizado en la ciudad de Bucaramanga.spa
dc.typePrácticaspa
dc.publisher.departmentEscuela de Ingenieríasspa
dc.publisher.programIngeniería Civilspa
dc.type.hasVersionpublishedVersionspa
dc.description.sectionalBucaramangaspa
dc.description.degreenameIngeniero Civilspa


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 Internacional