dc.contributor.advisorForero Sarmiento, Juan Carlos
dc.contributor.authorEcheverry Beltran, Fabian Andres
dc.coverage.spatialSeccional Bucaramanga. Universidad Pontificia Bolivariana. Escuela de Ingenierías. Facultad de Ingeniería Civilspa
dc.coverage.temporal2011
dc.date.accessioned2013-11-05T19:23:03Z
dc.date.available2013-11-05T19:23:03Z
dc.date.created2011-05-27
dc.date.issued2013-11-05
dc.identifier.urihttp://hdl.handle.net/20.500.11912/1205
dc.description98p.: (pdf); il; tablasspa
dc.description.abstractLa práctica empresarial desarrollada en la implementación del sistema de agua del proyecto plan maestro de servicios industriales de la Gerencia Refinería de Barrancabermeja se basó en la construcción del Edificio nuevo de ultrafiltración osmosis reversa. La construcción de este Edificio se realizó en un área total de 755.17 m2. Las principales actividades realizadas fueron: Excavaciones, rellenos, solados, fundida de concreto, andamios de carga. Se trabajó todo lo concerniente a la parte constructiva cantidades de obra, pedido recepción de materiales, procesos constructivos con el fin de dejar soporte técnico a la comunidad educativa, una guía de construcción de las actividades más relevantes ejecutadas durante el proyecto, apoyada en un seguimiento fotográfico e ilustrativo; en el análisis se tuvo en cuenta los equipos, materiales, y mano de obra utilizados para cada una de las actividades, planteando un orden de acuerdo a su proceso. Adicional está el proceso constructivo de un soporte de tuberías donde se muestra el tipo de estructura a construir, características geométricas, método constructivo a realizar, secuencia de construcción, concretos a utilizar y características de los aceros de refuerzo. Las conclusiones que se destacan en los aprendizajes obtenidos durante el desarrollo de la experiencia en la obra, son: 1) Dar seguimiento a los procesos constructivos, planteando una metodología de trabajo y planeación del mismo. 2) En las obras de construcción, donde requiera grandes cantidades de cemento, se deben desarrollar ciertos mecanismos con el fin de evitar que el calor de hidratación del cemento produzca fisuras en el concreto.spa
dc.description.abstractThe industrial practice based on the implementation of the water system from the industrial services master plan project from the Barrancabermeja refinery was focused on the construction of the reverse osmosis ultrafiltration new building, this was built on a total area of 755.17 m2. The analysis includes equipment, materials and workforce used for each activity, suggesting an order according to the process, main activities included excavation, filling, paving, concrete melting and scaffolding charge. Also worked in everything related to the constructive activities: quantities of work, ordering and receiving materials and other construction processes in order to provide technical support to the educational community, a construction guide of the most relevant activities is also included. Additional is presented the constructive process of a pipe support structure showing the type of build, geometric, constructive method to perform, sequence of construction, concrete to use and characteristics of the reinforcing steels. The main conclusion of the industrial practice is the great importance of monitoring the construction process by determining methodologies and work plans. Additionally, it was concluded that any construction work, which requires large quantities of cement should develop mechanisms to prevent that the heat of hydration from cement produces cracks into the concrete.
dc.language.isoes
dc.publisherUniversidad Pontificia Bolivarianaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectTesis y disertaciones académicasspa
dc.subjectRefinerías de petróleospa
dc.subjectDiseño y construcción - edificios de oficinaspa
dc.subjectOsmosisspa
dc.subjectAcerospa
dc.subjectMateriales de construcciónspa
dc.titleApoyar las obras requeridas para la implementación del sistema de agua del proyecto plan maestro de servicios industriales de la gerencia refinería de Barrancabermejaspa
dc.typeworkingPaperspa
dc.rights.accessRightsopenAccessspa
dc.type.hasVersionpublishedVersionspa
dc.identifier.instnameinstname:Universidad Pontificia Bolivarianaspa
dc.identifier.reponamereponame:Repositorio Institucional de la Universidad Pontificia Bolivarianaspa
dc.identifier.repourlrepourl:https://repository.unab.edu.co/


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 International
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 International