Mostrar el registro sencillo del ítem

dc.contributor.advisorForero Sarmiento, Juan Carlos
dc.contributor.authorFernandez Alzate, Cristian Camilo
dc.coverage.spatialSeccional Bucaramanga. Universidad Pontificia Bolivariana. Escuela de Ingenierías. Facultad de Ingeniería Civilspa
dc.coverage.temporal2011
dc.date.accessioned2013-11-05T19:23:02Z
dc.date.available2013-11-05T19:23:02Z
dc.date.created2011-05-26
dc.date.issued2013-11-05
dc.identifier.urihttp://hdl.handle.net/20.500.11912/1199
dc.description60p.: (pdf); il; tablas; anexosspa
dc.description.abstractEl proyecto de regulación del río Tona - embalse de Bucaramanga tiene como propósito garantizar el suministro de 1,1 m3/s adicionales al sistema del Acueducto Metropolitano de Bucaramanga. Se localiza en la parte baja de la subcuenca del río Tona, sitio en el cual el amb S.A. E.S.P. planea construir un embalse de 17,6 millones de m3 de capacidad, mediante el emplazamiento de una presa con una altura aproximada de 103 m que permitirá almacenar los caudales excedentes de invierno para ser utilizados en épocas de estiaje. Este proyecto garantizará el abastecimiento de agua potable al área de servicio del amb S.A. E.S.P. para los próximos 25 años. Mediante la Invitación Pública No. amb-046-09, cuyo objeto consiste en contratar los Estudios, Diseños, Construcción, Suministro e Instalación de Equipos, Operación y mantenimiento temporal de la presa, obras complementarias, aducción y By-pass a la planta de tratamiento Bosconia (componente I), para el Proyecto de Regulación del Río Tona – Embalse de Bucaramanga, se le adjudica dicha invitación al proponente único CONALVÍAS S.A. La Gerencia de Expansión Estratégica, la cual se encarga de gestionar todo lo relacionado con el proyecto declarado estratégico por la Junta Directiva del amb S.A. E.S.P. “Proyecto de Regulación del Río Tona – Embalse de Bucaramanga” además de su impacto económico, ambiental y social, lo cual incluye entre sus actividades: Adjudicación de la Interventoría del embalse de Bucaramanga, Seguimiento durante la etapa de Preconstrucción del embalse de Bucaramanga, Construcción del centro educativo rural Bosconia y la Invitación pública para realizar los estudios y diseños definitivos de la línea de conducción. Durante el periodo comprendido entre el 15 de Septiembre 2010 y el 15 de Marzo 2011, el practicante elaboró, participó y revisó material correspondiente al proceso de Preconstrucción y de selección de la Interventoría de obra para el Proyecto.spa
dc.description.abstractThe project of regulation in the Tona river – Bucaramanga´s reservoir has as a main purpose to guarantee the supply of 1,1 m3/s additional to the system of the Acueducto Metropolitano de Bucaramanga. It is located in the low part of the subbasin of the river Tona, site in which the amb S.A. E.S.P. wants to build a dam and made a reservoir of 17,6 millions of m3 of capacity, the dam will have an approximate height of 103 m that will allow to store the excessive flows on winters and be used in summer when the water flow its limited.. This project will guarantee the supply of drinkable water to the service area of the amb S.A. E.S.P. for the next 25 years. With the Public Invitation No. amb - 046-09, whose object consists of contracting the Studies, Designs, Construction, Supply and Installation of Equipments, Operation and temporary maintenance of the dam, complementary works, adduction and By-pass to the plant of treatment Bosconia (component I), for the Project of Regulation of the Tona river - Bucaramanga's Reservoir, The above mentioned invitation is awarded to the only bidder CONALVÍAS S.A. The Gerencia de Expansión Estratégica, which will takes charge of managing everything related to the declared strategic project by the Board of directors of amb S.A. E.S.P. " Project of Regulation of the Tona river - Bucaramanga's Reservoir " besides his economic, environmental and social impact, which includes between his activities: Adjudication of the Auditors of the construction of the Bucaramanga's reservoir, Follow-up during Preconstruction’s stage of Bucaramanga's reservoir, Construction of the rural school Bosconia and the public Invitation to realize the studies and definitive designs of the line of conduction. During the period between 15 September 2010 and 15 March 2011, the student elaborated, participates and checked material related to the process of Preconstruction and selection of the Auditors for the Project.
dc.language.isoes
dc.publisherUniversidad Pontificia Bolivarianaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectTesis y disertaciones académicasspa
dc.subjectRíosspa
dc.subjectTona (Santander, Colombia)spa
dc.subjectAMB S.A E.S.Pspa
dc.subjectEmbalsesspa
dc.subjectAcueductosspa
dc.subjectConalvías S.Aspa
dc.titleAuxiliar de ingeniería civil durante el proceso de pre-construcción del proyecto de regulación del río Tona - embalse de Bucaramangaspa
dc.typebacherlorThesisspa
dc.rights.accessRightsopenAccessspa
dc.type.hasVersionpublishedVersionspa
dc.identifier.instnameinstname:Universidad Pontificia Bolivarianaspa
dc.identifier.reponamereponame:Repositorio Institucional de la Universidad Pontificia Bolivarianaspa
dc.identifier.repourlrepourl:https://repository.unab.edu.co/


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 International
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 International