Mostrar el registro sencillo del ítem

dc.contributor.advisorCastillo Perez, Consuelo
dc.contributor.authorGarzon Garcia, Angela Patricia
dc.coverage.spatialBucaramangaspa
dc.coverage.temporalAño 2015spa
dc.date.accessioned2023-11-08T19:45:56Z
dc.date.available2023-11-08T19:45:56Z
dc.date.issued2015
dc.identifier.urihttp://hdl.handle.net/20.500.11912/11262
dc.description155 páginasspa
dc.description.abstractEl presente documento describe los lineamientos básicos a tener en cuenta para la formulación del plan de contingencia sobre el manejo de emergencias asociadas al sitio de disposición final de residuos sólidos - El Carrasco según lo estipulado en la resolución 154 de 2014, identificando y analizando las amenazas existentes en las diferentes actividades de operación de la entidad prestadora de servicio de aseo EMAB S.A. E.S.P. en condiciones actuales. Lo anterior, dio paso a la determinación del riesgo al que se encuentra expuesto el personal operativo y el medio ambiente a través de la evaluación de criterios de calificación sobre la probabilidad de ocurrencia y vulnerabilidad con respecto a las pérdidas económicas, daños ambientales, pérdida de imagen y afectación a las personas que el evento adverso pudiera generar en cualquier momento; permitiendo así reconocer los escenarios de riesgo prioritarios, es decir, aquellos considerados de magnitud media y alta a los cuales se les definieron los respectivos planes de acción como guía de acciones para el manejo adecuado de la emergencia. Finalmente, fueron establecidas las funciones y responsabilidades de quienes serán los encargados de implementar el plan y se describieron los programas de prevención tendientes a reducir, controlar y corregir el factor de riesgo hallado durante el estudio.spa
dc.description.abstractThis document describes the basic guidelines to consider when formulating contingency plans for risk management associated with the solid waste disposal site - El Carrasco, as stipulated in Resolution 154 of 2014, identifying and analyzing existing threats in different operating activities of the company providing sewage control service EMAB S.A. E.S.P in current conditions. This gave way to the risk assessment to which operating personnel and environment are exposed. This task was accomplished through the evaluation of probability of occurrence and vulnerability to economic losses, environmental damage, loss of image and affected people that the adverse event could generate at any time; allowing to recognize the priority risk scenarios, e.g. those considered of medium and high impact, for which action plans to guide actions for the proper handling of the emergency were established. Finally, roles and responsibilities of those who will be responsible for implementing the plan and prevention programs aimed at reducing, controlling and correcting the risk factor found during the study were described.spa
dc.format.mimetypeapplication/pdfspa
dc.language.isospaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectIngeniería Ambientalspa
dc.subjectAmenaza Riesgospa
dc.subjectPlanes de acciónspa
dc.subjectProgramas de prevenciónspa
dc.subjectVulnerabilidadspa
dc.subjectProbabilidad de ocurrenciaspa
dc.subjectEmergenciaspa
dc.titleFormulación del plan de contingencia para el manejo de emergencias asociados al sitio de disposición final de residuos sólidos - el carrascospa
dc.typeTrabajo de gradospa
dc.publisher.departmentEscuela de Ingenieríasspa
dc.publisher.programIngeniería Ambientalspa
dc.type.hasVersiondraftspa
dc.description.sectionalBucaramangaspa
dc.description.degreenameIngeniero Ambientalspa


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 Internacional