dc.contributor.advisorForero Sarmiento, Juan Carlos
dc.contributor.authorGutiérrez Lizcano, Lina Katherine
dc.coverage.spatialBucaramangaspa
dc.coverage.temporalAño 2015spa
dc.date.accessioned2023-09-27T17:27:32Z
dc.date.available2023-09-27T17:27:32Z
dc.date.issued2015
dc.identifier.urihttp://hdl.handle.net/20.500.11912/11166
dc.description84 páginasspa
dc.description.abstractEl trabajo de grado presentado a continuación comprende todas las labores ejecutadas por el practicante en la empresa Jaime Coloma y Cía Ltda., dentro de un periodo de cinco meses, específicamente en el área de programación y control de gastos de obra. Para cumplir con el desarrollo de actividades programadas, se inicia con afianzamiento de normas específicas para la instalación de redes hidrosanitarias, introducción al ERP de la empresa y su funcionamiento. Para después iniciar con la labor de seguimiento de reportes mensuales de flujo de caja dando como resultado los reportes para cada obra de Control de Gastos de Obra. También se hizo constantemente visita a obra para llevar el seguimiento detallado de avance de obra, según el porcentaje acumulado del mismo planteado en la teoría. Sustentación de los informes realizado, con el personal correspondiente. Cubicación detallada, de la tubería lineal empleada para la realización de un proyecto de instalaciones sanitarias domicilias, fitting, excavación, cámaras de inspección, tanques de almacenamiento, artefactos, grifería e insumos. Sustentación de los informes realizado, con el personal correspondiente. En el presente documento se presenta las actividades planteadas en los objetivos, así como también algunas que no, pero que fueron parte importante para el enriquecimiento de la experiencia como futura ingeniera civil.spa
dc.description.abstractThe work presented below grade, includes all work performed by the practitioner in the Company Jaime Coloma y Cía Ltda., within a period of five months, Fulfilling functions with the position of Assistant Project Management, in relation to the works currently underway by the Company, specifically in the area of programming and control of construction costs. To meet the development of activities scheduled, begins with strengthening specific rules Installation of plumbing networks, Introduction to ERP company and its operation. To then start with the follow-up monthly cash flow reports resulting reports for each work Expenditure Control Works. Also constantly made site visit to take detailed tracking of completion, as the cumulative percentage of it raised in theory. Sustainability reports made with the relevant personnel. This paper presents the activities outlined in the objectives, and also some not, but were important to enrich the experience for future civil engineering part.en
dc.format.mimetypeapplication/pdfspa
dc.language.isospaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectIngeniería Civilspa
dc.subjectPresupuestospa
dc.subjectPlanos As Builtspa
dc.subjectCubicaciónspa
dc.subjectFlujo de cajaspa
dc.subjectInstalación sanitariaspa
dc.titleApoyo y control en obras de instalacion de redes hidrosanitarias para la empresa jaime coloma y cia ltda.spa
dc.typeTrabajo de gradospa
dc.publisher.departmentEscuela de Ingenieríasspa
dc.publisher.programIngeniería Civilspa
dc.type.hasVersionpublishedVersionspa
dc.description.sectionalBucaramangaspa
dc.description.degreenameIngeniero Civilspa


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 Internacional