Implementación de técnicas de mantenimiento basado en condición para el fortalecimiento de la gestión del mantenimiento en el Acueducto Metropolitano de Bucaramanga S.A. ESP.
dc.contributor.advisor | Director. Córdoba Tuta, Edwin Jesús | |
dc.contributor.author | Rojas Gutiérrez, Nicolás Mateo | |
dc.coverage.temporal | 2021 | spa |
dc.date.accessioned | 2022-07-14T19:54:30Z | |
dc.date.available | 2022-07-14T19:54:30Z | |
dc.date.issued | 2022 | |
dc.identifier.uri | http://hdl.handle.net/20.500.11912/10124 | |
dc.description | 53p.: (pdf); il; imágenes; tablas; anexos. | spa |
dc.description.abstract | El proyecto realizado en el Acueducto Metropolitano de Bucaramanga S.A ESP. Tuvo como objetivo realizar un análisis detallado y estructurado acerca del Mantenimiento Centrado en Confiabilidad (RCM) a los equipos electromecánicos de la planta de tratamiento de Bosconia, dicho proceso fue realizado a los equipos de Cloración y Bombeo, siendo este el plan piloto para evaluar y garantizar el mejoramiento de las condiciones no solo de seguridad, sino también del medio ambiente y operativas dentro de la organización. Este procedimiento, tuvo como enfoque las 7 preguntas del proceso RCM, especificando las funciones, fallas, modos y efectos consignados en la hoja de información RCM; para así evaluar las fallas presentadas y asignar las tareas de mantenimiento optimas y correctas las cuales fueron consignadas en la hoja de decisión RCM, cumpliendo con la norma SAE JA 1011. Con el programa, se buscó por medio de una metodología de gestión del mantenimiento garantizar el cumplimiento de las funciones de los activos, buscando un mejor desempeño económico y aprovechamiento en cuanto al recurso humano con el que actualmente está conformado la empresa. | spa |
dc.description.abstract | The project carried out in the Metropolitan Aqueduct of Bucaramanga S.A ESP. The objective was to carry out a detailed and structured analysis of the Maintenance Focused on Reliability (RCM) to the electromechanical equipment of the Bosconia treatment plant, said process was carried out to the Chlorination and Pumping equipment, this being the pilot plan to evaluate and ensure the improvement of the conditions not only of safety, but also of the environment and operations within the organization. This procedure focused on the 7 questions of the RCM process, specifying the functions, failures, modes and effects recorded in the RCM information sheet; in order to evaluate the failures presented and assign the optimal and correct maintenance tasks which were recorded in the RCM decision sheet, complying with SAE JA 1011. With the program, it was sought through a maintenance management methodology to ensure the fulfillment of the functions of the assets, seeking a better economic performance and use in terms of the human resource with which the company is currently formed. | en |
dc.format.mimetype | application/pdf | spa |
dc.language.iso | spa | spa |
dc.publisher | Universidad Pontificia Bolivariana | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Instituciones públicas - AMB (Acueducto Metropolitano de Bucaramanga) | spa |
dc.subject | Mantenimiento - Equipos y accesorios | spa |
dc.subject | Confiabilidad | spa |
dc.title | Implementación de técnicas de mantenimiento basado en condición para el fortalecimiento de la gestión del mantenimiento en el Acueducto Metropolitano de Bucaramanga S.A. ESP. | spa |
dc.type | Trabajo de grado | spa |
dc.publisher.department | Escuela de Ingenierías | spa |
dc.publisher.program | Ingeniería Mecánica | spa |
dc.type.hasVersion | publishedVersion | spa |
dc.description.sectional | Bucaramanga | spa |
dc.description.degreename | Ingeniero Mecánico | spa |