Planificación integral del mantenimiento mayor en la unidad 3 de generación ubicado en la Central Sogamoso
| dc.contributor.advisor | Santos Jaimes, Alfonso | |
| dc.contributor.author | Jaimes Muñoz, Leyner Hernando | |
| dc.coverage.spatial | Bucaramanga | |
| dc.coverage.temporal | 2025 | |
| dc.creator.grantor | Universidad Pontificia Bolivariana | |
| dc.date.accessioned | 2026-05-25T20:24:27Z | |
| dc.date.issued | 2025 | |
| dc.description | Paginas 46 | spa |
| dc.description.abstract | La central Sogamoso cumple 10 años de operación comercial, estableciendo el tiempo necesario para la intervención del mantenimiento mayor de las unidades de generación. Se realiza un estudio preliminar del funcionamiento de los equipos con los que cuenta la central para su correcto funcionamiento, previamente se realiza una lectura de los manuales, planos e información de relevancia para realizar la planificación del mantenimiento mayor de una de las unidades de generación. Teniendo una recopilación de información y depuración de información para la determinación de las actividades principales que se llevaran al cabo en la ejecución del mantenimiento, donde se determinara los recursos materiales, humanos y en paralelo se realizara la creación de guías de mantenimiento y actualizaciones de las mismas se lo requiere, procedimientos, creación y extensión de materiales que serán requeridos para la correcta ejecución del mantenimiento, ya que es el primer mantenimiento mayor de la central y de ahí se recopilara información de gran relevancia para los próximos mantenimientos mayores logrando así la disponibilidad de los equipos y confiabilidad de operación de la central Sogamoso. | spa |
| dc.description.abstract | The Sogamoso plant is 10 years old, providing the time necessary for major maintenance of the generation units. Preliminary study of the operation of the equipment available at the plant for its proper functioning, prior to which a reading of the manuals is carried out, drawings and information relevant for the planning of major maintenance of one of the generation units. Having information collection and cleansing of information for the identification of major activities to be carried out in the execution of maintenance, where material resources are identified, human and in parallel the creation of maintenance guides and updates thereof is required, procedures, creation, and extension of materials that will be required for the correct execution of maintenance, it is the first major maintenance of the plant, and from there will be collected information of great relevance for the next major maintenance, thus achieving the availability of equipment and reliability of operation of the Sogamoso plant. | eng |
| dc.description.degreename | Ingeniero Mecánico | |
| dc.description.sectional | Bucaramanga | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.uri | http://hdl.handle.net/20.500.11912/13908 | |
| dc.language.iso | spa | |
| dc.publisher.department | Escuela de Ingeniería | |
| dc.publisher.program | Ingeniería Mecánica | |
| dc.rights | Attribution-NonCommercial-NoDerivs 2.5 Colombia | en |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/2.5/co/ | |
| dc.subject | Turbina Francis | spa |
| dc.subject | mantenimiento mayor | spa |
| dc.subject | confiabilidad | spa |
| dc.subject | disponibilidad | spa |
| dc.subject | energía hidráulica | spa |
| dc.title | Planificación integral del mantenimiento mayor en la unidad 3 de generación ubicado en la Central Sogamoso | spa |
| dc.type | Trabajo de grado | spa |
| dc.type.hasVersion | publishedVersion |