dc.contributor.advisor | Torrado Gómez, Luz Marina | |
dc.contributor.author | Ayala Silva, Sergio Augusto | |
dc.coverage.temporal | 2014 | |
dc.date.accessioned | 2022-04-20T22:23:52Z | |
dc.date.available | 2022-04-20T22:23:52Z | |
dc.date.issued | 2014 | |
dc.identifier.uri | http://hdl.handle.net/20.500.11912/9959 | |
dc.description | 58 páginas | spa |
dc.description.abstract | El siguiente trabajo tiene como objetivo presentar las actividades ejecutadas en la
práctica profesional, basadas en información recopilada durante el transcurso de las
pasantías en la empresa Obras Construcciones y Pavimentos S.A.S, dedicada a la construcción de estructuras en concreto para locaciones petroleras de Mansarovar
Energy Colombia Ltda en Puerto Boyacá, Boyacá.
La práctica se llevó a cabo en el área de producción, supervisando y controlando el
buen funcionamiento de la planta de concreto para dar cumplimiento a la programación de obra del proyecto.
Diaria, semanal y mensualmente se consignaron reportes de obra con registros
fotográficos, generando inspección sobre lo ejecutado.
El proyecto por sí mismo genera una enseñanza respecto a las obras ejecutadas y da un gran aporte al conocimiento y entendimiento en este campo, en el trabajo se encontrara un seguimiento a los procesos de construcción y elaboración del concreto. | spa |
dc.description.abstract | This document has as objective to present the activities implemented through the
professional practicum, based on the collected data during the professional intervention process, developed at Obras, Construcciones y Pavimentos S.A.S., a company dedicated to the construction of concrete structures for oil locations of Mansarovar Energy Colombia Ltda. in Puerto Boyacá, Boyacá.
The practicum was carried out in the Production Department, monitoring and controlling the proper functioning of the concrete plant in order to fullfill the programming of the construction project. The construction reports and photographies were compiled daily, weekly and monthly, registering what was examined and implemented.
The project reflects a magnificent training of the executed plans and an important
contribution and understanding of this field. Therefore, this document is supported by the
monitoring of the construction processes and concrete production. | eng |
dc.format.mimetype | application/pdf | |
dc.language.iso | spa | |
dc.publisher | Universidad Pontificia Bolivariana | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Ingeniería Civil | spa |
dc.subject | Hormigón | spa |
dc.subject | Empresas - Obras construcciones y pavimentos S.A.S. | spa |
dc.subject | Empresas - Mansorovar Energy Colombia LTDA - Boyacá | spa |
dc.title | Apoyo en los procesos de producción de concretos, generación de actas de obra y facturación | spa |
dc.type | Trabajo de grado | spa |
dc.publisher.department | Escuela de Ingenierías | spa |
dc.publisher.program | Ingeniería Civil | spa |
dc.type.hasVersion | publishedVersion | spa |
dc.description.sectional | Bucaramanga | spa |
dc.description.degreename | Ingeniero Civil | spa |