Mostrar el registro sencillo del ítem
Proyecto casino por etapas – diseño de viás interiores, proyecto nueva portería en la empresa Palmas del Cesar
dc.contributor.advisor | Ospina Idárraga, Gustavo Andrés | |
dc.contributor.author | Sepúlveda Martínez, José Eduardo | |
dc.coverage.temporal | 2019 | |
dc.date.accessioned | 2020-11-19T14:04:22Z | |
dc.date.available | 2020-11-19T14:04:22Z | |
dc.date.issued | 2019 | |
dc.identifier.uri | http://hdl.handle.net/20.500.11912/6416 | |
dc.description | 58 páginas | spa |
dc.description.abstract | El presente documento posee toda la información referente a las practicas de ingeniería civil realizadas en desde la fecha del 24 de julio del 2018 hasta el 24 de enero del 2019 en la empresa Palmas del Cesar S.A, empresa dedicada al cultivo de palma africana y producción de aceite de palma, que como gran empresa tiene la intención de llevar a cabo dos proyectos de infraestructura, una infraestructura de servicios e alimentos y otra de infraestructura vial, en el interior de las propias instalaciones de sus terrenos. En los (6) meses de realización de la práctica se le encargó el apoyo y acompañamiento de la revisión y corrección de los diseños y presupuestos adquiridos por la empresa para el proyecto Casino implemento metodologías de precios unitarios para el desarrollo de presupuestos y métodos de cálculos de cantidades de obra orientados a los análisis geométricos de los materiales. Así como la preparación y organización de la información necesaria para el diseño de la vía interna de la empresa. | spa |
dc.description.abstract | The present document has all the information regarding the civil engineering practices carried out since July 24, 2018 until January 24, 2019 in the company Palmas del Cesar SA, a company dedicated to the cultivation of African palm and production of palm oil, which as a large company intends to carry out two infrastructure projects, an infrastructure of services and food and another road infrastructure, inside the own facilities of their land. In the (6) months of completion of the practice, he was entrusted with the support and accompaniment of the revision and correction of the designs and budgets acquired by the company for the project. Casino implemented unit price methodologies for the development of budgets and calculation methods of quantities of work oriented to the geometric analysis of materials. As well as the preparation and organization of the necessary information for the design of the internal way of the company. | eng |
dc.format.mimetype | application/pdf | |
dc.language.iso | spa | |
dc.publisher | Universidad Pontificia Bolivariana | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Empresas - Palma del Cesar | spa |
dc.subject | Construcción - Presupuestos | spa |
dc.subject | Precios unitarios | spa |
dc.subject | Transporte | spa |
dc.subject | Vías de tránsito | spa |
dc.subject | Carreteras - Diseño y construcción | spa |
dc.title | Proyecto casino por etapas – diseño de viás interiores, proyecto nueva portería en la empresa Palmas del Cesar | spa |
dc.type | Práctica | spa |
dc.publisher.department | Escuela de Ingenierías | spa |
dc.publisher.program | Ingeniería Civil | spa |
dc.type.hasVersion | publishedVersion | spa |
dc.description.sectional | Bucaramanga | spa |
dc.description.degreename | Ingeniero Civil | spa |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Trabajos de grado [6383]
Monografías, artículos, informes, proyecto de grado