Mostrar el registro sencillo del ítem

dc.contributor.advisorMantilla Saavedra, Juan Carlos
dc.contributor.authorLobo Criado, Luz Karime
dc.coverage.spatialSeccional Bucaramanga. Universidad Pontificia Bolivariana. Escuela de Ingenierías. Facultad de Especialización en Control e Instrumentación Industrialspa
dc.coverage.temporal2011
dc.date.accessioned2013-11-05T19:23:12Z
dc.date.available2013-11-05T19:23:12Z
dc.date.created2011-03-24
dc.date.issued2013-11-05
dc.identifier.urihttp://hdl.handle.net/20.500.11912/1286
dc.description128p.: (pdf); il; tablas; anexosspa
dc.description.abstractActualmente en la Universidad Pontificia Bolivariana Seccional Bucaramanga, se encuentran ubicados los equipos de aire acondicionado como el Chiller, que en conjunto con las bombas, válvulas, transmisores de presión y el cableado, se comunica el sistema con la Biblioteca en donde se encuentra una Manejadora ya instalada, así como los equipos Fan-coil ubicados en los 10 salones del 4 piso de la UPB Bga, y la manejadora para suministrar el aire frio al auditorio menor. En este proyecto se realiza la instalación y adecuación de 2 paneles de control y 10 sensores de temperatura para los 10 salones del 4 piso Del Edificio J de la UPB Bga, con el fin de complementar el control de la temperatura no solo para la biblioteca y el auditorio sino también para el 4 piso del Edificio J de la UPB. De acuerdo a la información obtenida de los sensores de temperatura que es enviada a las controladoras ubicadas en los 2 paneles de control instaladas, se realiza el monitoreo de la temperatura y control del mismo a través del software Andover Continuum, en donde dependiendo de la temperatura obtenida y la temperatura deseada, se controla el ángulo de apertura de las válvulas ubicadas en los ductos del aire acondicionado de las salas a monitorear. (Biblioteca, Auditorio menor, 10 salones 4 piso del Edificio J UPB Bga) Se debió realizar cambios en cuanto a conexión de los equipos ya instalados y ductos para los salones del 4 piso. Los resultados obtenidos son satisfactorios en cuanto al monitoreo y control de la temperatura en los 10 salones de la UPB J 4 piso.spa
dc.description.abstractCurrently in the Universidad Pontificia Bolivariana on Bucaramanga, there are conditioned air equipments of brands as Chiller, which communicates together with the pumps, valves, pressure transmitters and wiring, with the library system, where there is Handler already installed, as the equipment Fan-coil, located in ten classrooms of the fourth floor of UPB Bga, and the handler to provide cold air to the minor auditorium. In this project, the installation and adaptation of two control panels and 10 temperature sensors for the 10 classrooms of the fourth floor of the J building of the UPB Bga is made, in order to complement the temperature control not just for the library and auditorium, also for the fourth floor of the J building of UPB. According to the information provided by the temperature sensors sent to the controller in the two control panels already installed, the temperature monitoring and control is performed using Andover Continuum, where depending of obtained temperature, and wanted temperature, the aperture angle of the valves in the air ducts of the monitored rooms is controlled.(Library,Minor Auditorium,10 classrooms of the fourth floor of the J building UPB Bga). It was necessary to make changes in the already installed equipment wiring and fourth floor classroom ducts. The obtained results are successful, in terms of the monitoring and temperature control of the 10 classrooms of the UPB J fourth floor.
dc.language.isoes
dc.publisherUniversidad Pontificia Bolivarianaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectIngeniería electrónicaspa
dc.subjectTesis y disertaciones académicasspa
dc.subjectAutomatizaciónspa
dc.subjectAire acondicionado (HVAC)spa
dc.subjectEdificiosspa
dc.subjectDetectoresspa
dc.titleAutomatización del sistema de aire acondicionado (HVAC) para el cuarto piso del edificio J torre norte y torre sur de la UPB Bucaramangaspa
dc.typebookspa
dc.rights.accessRightsopenAccessspa
dc.type.hasVersionpublishedVersionspa
dc.identifier.instnameinstname:Universidad Pontificia Bolivarianaspa
dc.identifier.reponamereponame:Repositorio Institucional de la Universidad Pontificia Bolivarianaspa
dc.identifier.repourlrepourl:https://repository.unab.edu.co/


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 International
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 International