Mostrar el registro sencillo del ítem

dc.contributor.advisorGuzmán Benavides, Sergio
dc.contributor.authorBarbosa Santos, Jhon Jairo
dc.coverage.spatialSeccional Bucaramanga. Universidad Pontificia Bolivariana. Escuela de Ingenierías. Facultad de Ingeniería Electrónicaspa
dc.coverage.temporal2011
dc.date.accessioned2013-11-05T19:23:06Z
dc.date.available2013-11-05T19:23:06Z
dc.date.created2011-06-03
dc.date.issued2013-11-05
dc.identifier.urihttp://hdl.handle.net/20.500.11912/1229
dc.description135p.: (pdf); il; tablas; anexosspa
dc.description.abstractLos planteamientos establecidos inicialmente para el desarrollo de este proyecto de investigación “Estudio de confiabilidad y automatización de las redes de nivel de tensión de dos” fueron: La recopilación de la información de interrupciones: fue efectuada en dos etapas. En la primera, se tomaron fotos de las planillas de subestación o Reporte Diario de Operación (Esto debido a que la información necesaria para dicho estudio no se encontraba en medio electrónico), y en la segunda, se filtro y ordeno la información electrónica suministrada por la empresa modelo. Probabilidades unitarias de falla: Para la determinación de las funciones de probabilidad necesarias para la simulación de eventos de falla y con ello la evaluación del comportamiento futuro del sistemas bien sea con o sin equipos de corte adicionales, se determinaron inicialmente, y en forma minuciosa, de la información recopilada, las duraciones y número de interrupciones clasificadas por tipo de falla durante el periodo comprendido. Simulación probabilística sin equipos de corte en la red: Una vez obtenida la topología de la base de datos de Spard, estos circuitos fueron simulados en el Spard Power, el cual, utilizando la funciones de probabilidad y los valores característicos procedió a calcular (utilizando el método de Montecarlo) los DES y FES más cercanos de cada nodo de cada circuito. Simulación con equipos de corte y seccionamiento: la ubicación óptima de equipos de corte y seccionamiento se realizara con el fin único de disminuir las fallas en las redes. Nuevamente se obtendrán los promedios del FES y DES, para poder compararlos directamente con las simulaciones sin equipos de corte y seccionamiento mencionadas anteriormente. Acople con resolución CREG 097 de 2008: Es necesario que el proyecto se rija por la normatividad vigente. Se incluirán los nuevos indicadores de calidad, permitiendo conocer el ITAD, IRAD, NTT, ΔDtn,m ,EPU, NTG, ITG y demás indicadores, además de la energía no suministrada al usuario. Viabilidad Económica: Son indiscutibles los beneficios que un equipo de corte y seccionamiento puede llegar a prestar desde el punto de vista de calidad del servicio a una red eléctrica. Sin embargo, será necesario estudiar los indicadores de calidad y analizar si estos sobrepasan las metas propuestas o si la instalación de un equipo de corte y seccionamiento en la red no es necesaria.spa
dc.description.abstractThe approach initially established for the development of research project "Study of reliability and automation ofvoltage level networks oftwo "were: The collection of information gaps: it was conducted in two stages. In the first, took pictures of the forms of substation Daily Report of Operations (This is because the information necessary to this study did not address was in the middle), and in the second, filter and sort the electronic information provided by the company model. Unit probability of failure: For the determination of the functions likely needed for the simulation of fault events and thus future performance evaluation systems either with or without equipment additional cutting, were initially determined, and thoroughly, in the information collected, the duration and number of interruptions classified by type of failure during the period. Simulation probability without cutting equipment in the network: Once the topology data base of Sparda, these circuits were simulated in the Sparda Power, which, using the probability functions and values characteristic proceeded to calculate (using the Monte Cario method) the DES and FES nearest each nade of each circuit. Simulation equipment cutting and sectioning: the optimal location and cutting equipment switching is done with the sale purpose of reducing failures networks. Will again FES averages and DES, to compared directly with simulations without cutting equipment sections mentioned above. Attach resolution CREG 097, 2008: lt is necessary that the project is governed by existing regulations. lt include new indicators of quality, allowing to know the ITAD, IRAD, NTT, .llDtn, m, EPU, NTG, ITG and other indicators, in addition to energy provided to the user. Economic viability: the benefits are undeniable cutting equipment and isolation can become delivered from the standpoint of quality a grid service. However, it is necessary to study quality indicators and analyze whether these exceed the targets set or if the installation of equipment and breaking into the network is not necessary.
dc.language.isoes
dc.publisherUniversidad Pontificia Bolivarianaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectAutomatizaciónspa
dc.subjectBases de datosspa
dc.subjectRedes de informaciónspa
dc.subjectRedes eléctricasspa
dc.subjectTransmisión de energía eléctricaspa
dc.subjectFES (frecuencia equivalente de servicio)spa
dc.subjectDES (duración equivalente de servicio)spa
dc.subjectFallas de sistemas (ingeniería)spa
dc.titleEstudio de confiabilidad y automatización de la distribución en las redes de nivel de tension DOSspa
dc.typebacherlorThesisspa
dc.rights.accessRightsopenAccessspa
dc.type.hasVersionpublishedVersionspa
dc.identifier.instnameinstname:Universidad Pontificia Bolivarianaspa
dc.identifier.reponamereponame:Repositorio Institucional de la Universidad Pontificia Bolivarianaspa
dc.identifier.repourlrepourl:https://repository.unab.edu.co/


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 International
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 International