dc.contributor.advisor | Reyes Mantilla, Fernando | |
dc.contributor.author | González Serrano, Nathalia Milena | |
dc.coverage.spatial | Bucaramanga | spa |
dc.coverage.temporal | 2020 | spa |
dc.date.accessioned | 2024-05-06T16:52:49Z | |
dc.date.available | 2024-05-06T16:52:49Z | |
dc.date.issued | 2020 | |
dc.identifier.uri | http://hdl.handle.net/20.500.11912/11648 | |
dc.description | 37 páginas | spa |
dc.description.abstract | Este documento relata todas las actividades que se realizó en el barrio las villas de Floridablanca con el Consorcio Villa VR en el cual se trabajó en el proyecto ´´ REPOSICION DE REDES DE DISTRIBUCIÓN POIR 6.3 ´´ el cual se trató de instalar tubería de PVC. Los objetivos planteados se lograron cumplir llevando una bitácora de obra que se registraba las actividades diarias y los imprevistos presentes durante la realización de la obra, también se colaboró con las socializaciones necesarias para que la comunidad este bien informada, así mismo se realizaron las actas de vecindad y las de cierre. Por solicitud de la empresa contratante (amb) se hace los diagramas de esquina y empalme con su respectivo formato, además se implementó una tabla y diagrama para el control de las viguetas para verificar las características del concreto. De la misma manera contiene paso a paso la realización de algunas actividades como la instalación de tubería y pavimentación y finalmente se menciona el protocolo implementado para la prevención de propagación de la pandemia COVID 19. | spa |
dc.description.abstract | This document describes all the activities that were carried out about Las Villas neighborhood from Floridablanca with the Villa VR Consortium in which the project ´´ REPOSITION OF DISTRIBUTION NETWORKS POIR 6.3 ´´ was worked on, which tried to install PVC pipes. The objectives set were achieved by keeping a work log that recorded the daily activities and unforeseen events during the work, we also collaborated with the necessary socializations so that the community is well informed, likewise the minutes of neighborhood and closing. At the request of the contracting company (amb), the corner and splice diagrams are made with their respective format, in addition a table and diagram for the control of the joists was implemented to verify the characteristics of the concrete. In the same way, it contains step by step the realization of some activities such as the installation of pipes and paving and finally the protocol implemented for the prevention of the spread of the COVID 19 pandemic is mentioned. | en |
dc.format.mimetype | application/pdf | spa |
dc.language.iso | spa | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Collarín | spa |
dc.subject | Registro de corte | spa |
dc.subject | Registro de incorporación | spa |
dc.subject | Dovelas | spa |
dc.subject | Dilataciones | spa |
dc.subject | Válvulas | spa |
dc.title | Auxiliar de ingeniería en la reposición de redes de acueducto en el barrio Las Villas. | spa |
dc.type | Práctica | spa |
dc.publisher.department | Escuela de Ingeniería | spa |
dc.publisher.program | Ingeniería Civil | spa |
dc.type.hasVersion | publishedVersion | spa |
dc.description.sectional | Bucaramanga | spa |
dc.description.degreename | Ingeniero Civil | spa |